Monting d.o.o.
Reconstruction of boiler WBK-1
The project covered the reconstruction of the 125 t/h high-pressure steam boiler WBK-1, including dismantling, pre-assembly of segments, welding, heat treatment, non-destructive testing (NDT) and pressure testing. The work was carried out in demanding spatial conditions, with careful coordination of activities, safe handling of equipment and adherence to high standards of workmanship.
Project details
- Project
- Reconstruction of boiler WBK-1
- Client
- Monting d.o.o.
- Year
- 2024
- Location
- Osijek, Croatia
- Category
- Boiler construction
Projects
See our other projects
A selection of repair and installation projects carried out in Croatia and across Europe.