Industroremont

Petrokemija d.d.

Replacement of a hall's steel structure

The work comprises the extensive dismantling of the existing steel structure and the erection of a new one in the upper part of the hall, while the existing equipment stays in place. This approach requires careful planning of every step and appropriate temporary support so that the stability and load-bearing capacity of the structure are maintained throughout the work.

Because of the complexity of the task, the project is being carried out in several separately contracted phases, with a precisely defined sequence and schedule. Depending on site conditions and project requirements, individual phases are executed successively or in parallel.

Particular attention is paid to safe execution, the stability of the structure during all phases of the work and compliance with the technical documentation and the prescribed occupational safety measures.

Project details
Project
Replacement of a hall's steel structure
Client
Petrokemija d.d.
Year
2025–2027
Location
Kutina, Croatia
Category
Steel structure
Projects

See our other projects

A selection of repair and installation projects carried out in Croatia and across Europe.